iso1iso2iso3
Projects
TT07 - Total Kharir Airstrip Making
Engineering, Procurment & Construction (EPC)
TT08 - Total Kharir Fire & Gas Upgrade Project
Engineering, Procurement & Construction of Upgrade of CPU Fire & Gas System
TT04 - Total Kharir CPU Fire Fighting Upgrade Proj
Client
TOTAL E&P Yemen

Duration
2008-01-28 - 2009-12-31

Engineering, Procurment & Construction (EPC)
  • Installation of underground 14" fire water network and 3" foam network covering the CPU area, equipped with 9 water hydrants, 37 water/foam hydrant monitor and 37 hose boxes
  • Installation of fire water curtains at the oil storage tank area
  • Installation of two diesel engine driven firewater pumps, motor driven jockey pump and foam package.
  • Extending the road, Fence and the outdoor lighting to accomodate the new fire water pumps and tank in to the CPU area
  • Connecting the new fire fighting system to the existing MCC

 

designed by Snono.com Career Contact Us