iso1iso2iso3
Projects
TT14 TOTAL Kharir Water Treatment Unit & Inject
The PLANT shall be called Water Treatment Unit and Inject facilities (WTU&IF).
YL09 YGC Additional LPG storage Tanks and Loading
WORK performed on the Plant and/or within the EXISTING FACILITIES
YL13 INSULATION MAINTENANCE SERVICES
Client
YEMEN LNG Company

Duration
2013-07-01 - 2016-06-30

On 1st July, 2013 TANMIA was awarded new Maintenance Contract “Insulation Services” by Yemen LNG for work in Balhaf Plant.


 

Location: BALHAF, Republic of Yemen

 

 

Scope of Work:

 

Installing, repairing and removing Insulations (Cold and Hot) of pipes, vessels, equipment, and specific areas as requested by Company

 

 

The Following facilities and units are included within the Scope of Work:

 

  •        Feed gas reception facilities
  •        Acid gas removal unit
  •        Gas dehydration unit
  •        Mercury removal unit
  •        Feed pre-cooling unit
  •        Fractionation unit
  •        Liquefaction unit
  •        Refrigeration unit
  •        End flash gas unit
  •        Fuel gas unit
  •        Fresh water unit
  •        Spill basins

 

 

-       The following are the common facilities and units:

 

  •        Fire fighting generation and distribution
  •        LNG fire fighting ground
  •        Emergency diesel power generation/distribution unit
  •        Auxiliaries power generation/distribution unit
  •        Air system
  •        HVAC
  •        Common receiving facilities
  •        Effluent treatment facilities
  •        Flares and liquid blow down systems

 

designed by Snono.com Career Contact Us